• Products
  • Solutions
  • Support
  • About
Campbell Scientific logo Campbell Scientific logo Campbell Scientific logo
solutions
  • Home
  • Products
  • Solutions
  • Support
  • About
  • Quote List
  • Contact
  • Regional Websites
    • Regional Websites
    • ภาษาไทย
    • Africa
    • Australia
    • Brasil
    • Canada
    • Centro Caribe
    • Deutschland
    • España
    • Europe
    • France
    • India
    • United States
    • 中国
    • Country Directory
  • Log In

Assembling the mast on the ground Attaching the crossarm to the mast prior to installing the mast.

This video demonstrates how to assemble the mast assembly on the ground prior to installing the mast into the tripod base.

Length: 2:24
Tags: Campbell Connections Installation Weather Station
Visit the Video Library

Related Videos

  • Tripod Assembly (4:00)
  • Guy Wire Assembly (3:24)
  • Enclosure Mast Mount (2:02)
  • Mount a solar panel to the mast (1:49)
  • Mounting a Crossarm (1:21)
  • 3 meter mast ground assembly (2:19)
  • Solar Panel Extended Bracket (3:15)
  • Enclosure leg mount (1:36)

Related Products

  • CM106BE Tripod - 2-3 m Galvanized-Steel-Tubing Tripod
  • WXPRO - Entry-Level Research-Grade Weather Station

CAMPBELL SCIENTIFIC UNITED KINGDOM

  • Home
  • Products
  • Solutions
  • Support
  • About
  • Newsroom
  • Events
  • Corporate Blog
  • User Forum
  • Contact Us
  • Customer Center
  • Feedback
  • ISO 9001:2015 Certified
  • Site Map

country map

80 Hathern Road
Shepshed,
Loughborough
LE12 9GX
UNITED KINGDOM


Feedback? Feedback? © 2022 Campbell Scientific United Kingdom